| -Hot Tapping Tee-Off System -Air Conditioning and Ventilation System -Plumbing and Drainage System -Electrical System |
|
![]() |
![]() |
| Central Ventilation system at Central Government Office | Chiller Water System at iSQUARE |
![]() |
![]() |
| Air Conditioning System at HK Airport terminal 1 | Install Sea Water Pumping System at One Island East |
![]() |
![]() |
| Water Cooling System at THE ONE | Installation of Chiller System at THE ONE |
![]() |
![]() |
| Electrical Control Panel for MTR | MTR - 2 hours fire hose spray Flamebar wind ventilation engineering |
![]() |
|
Sai Ying Pun, Hong Kong Island Line tunnel smoke simulation system security safety testing |
|
![]() |
![]() |
| Hot Tapping Tee-Off System | Chek Lap Kok Airport Hot Tapping at USB room |
![]() |
![]() |
| 2 hours Fire Rated Enclosure | Customized Hydraulic Valve and Stand |
![]() |
![]() |
| Customized Hydraulic Gate | “UniTap” Machine using A/C Power Generator |
![]() |
![]() |
| “UniTap” Machine with Gasoline Generator | “UniTap” Machine Fixture |